Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.

The U.S. Army Corps of Engineers (USACE), embarked on one of the largest and most comprehensive public works projects in American history following the catastrophic damage caused by Hurricane Katrina in 2005. The Hurricane and Storm Damage Risk Reduction System (HSDRRS) program was established to provide the greater New Orleans Area a 100-year level of risk reduction. One of the most critical measures of the HSDRRS was protection of refurbished earthen levees against the erosion-causing hydraulic forces of storm surge overtopping. Without protection, overtopping can lead to significant landside erosion and potentially a breach of the levee. During Hurricane Katrina, most levee failure was due to water overtopping.
The USACE needed a proven solution, so they partnered with Colorado State University (CSU) to build a full-scale wave overtopping simulator. The simulator tested erosion resistance of the PROPEX® Armormax® system for 500-year resiliency HSDRRS overtopping conditions. Testing showed that PROPEX Armormax, consisting of High Performance Turf Reinforcement Mat (HPTRM) and Engineered Earth Anchors (EEA), provided increased levee resilience and durability. Additionally testing showed that PROPEX Armormax reinforced vegetation on the earthen levees, which reduces the risk of breaching caused by overtopping waves.
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.

Providing levee resilience and durability

Providing levee resilience and durability

Breached Levee

CSU Wave Overtop
Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.
Comprehensive containment and capping at Thailand’s ESBEC landfill
Solmax supplied GSE® HD liners and BENTOLINER® GCLs to line and cap Thailand’s ESBEC landfill, ensuring full containment, leachate and gas control, and compliance with national and international waste standards.
Providing a stabilized platform for site development in soft soil and flood-prone areas: an alternative to traditional stabilization methods
MIRAFI® RS580i stabilized parking areas at Knapheide’s Moncks Corner facility over soft, floodplain-adjacent soils, enabling rapid construction, eliminating chemical treatment, reducing material haulage, and delivering durable performance under heavy vehicle loading.