Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.

In May 2012, the IMAX parking lot in Mississauga, Ontario, was selected as a demonstration site for the Ontario Ministry of Environment's Innovative Technology Program. This program showcases various Low Impact Development Technologies (LID). Low Impact Development is a progressive approach to stormwater management, aiming to replicate the natural water balance by managing rainfall at its source with techniques like permeable pavers. The objective of these initiatives is to safeguard and enhance water quality in the Great Lakes, a vital drinking water source for 80 percent of Ontario's population.
The project involved excavating the existing pavement system and installing subdrains. These subdrains were then encased in MIRAFI® 160N nonwoven geotextile. Following this, the sorptive tank system was implemented, along with the MIRAFI RS380i, a 0.75 in (19 mm) clear drainage layer, as well as the curb and bioswale system. The final step was the installation of permeable pavers.
MIRAFI RS380i was crucial in allowing the designers to preserve the pavement system's integrity without the need for excessive subgrade excavation. Over a decade later, the pavement system is still functioning effectively.


Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.
Comprehensive containment and capping at Thailand’s ESBEC landfill
Solmax supplied GSE® HD liners and BENTOLINER® GCLs to line and cap Thailand’s ESBEC landfill, ensuring full containment, leachate and gas control, and compliance with national and international waste standards.
Providing a stabilized platform for site development in soft soil and flood-prone areas: an alternative to traditional stabilization methods
MIRAFI® RS580i stabilized parking areas at Knapheide’s Moncks Corner facility over soft, floodplain-adjacent soils, enabling rapid construction, eliminating chemical treatment, reducing material haulage, and delivering durable performance under heavy vehicle loading.