Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.

In 2020, the Municipality of Anchorage’s Solid Waste Services department (SWS) decided to expand its landfill capacity by adding a new cell 9 and tying it to a number of existing cells in close proximity. Alaska Aggregate Products, LLC (AAP) was awarded the geosynthetics and piping contract and chose Solmax to supply all of the required geosynthetics. AAP installed approximately 650,000 ft² (60,000 m²) of a composite liner system for the new cell. The liner composite system consisted of BENTOLINER® NW Geosynthetic Clay Liner (GCL), 80mil (2mm) double-sided textured GSE® HD liner and a 16 oz (450 g) cushion geotextile with a HDPE Leachate Collection Piping System.
For this project, a site-specific slope-stability analysis was performed by the engineering firm, Bristol Engineering Services Company, LLC. The specifications called for a GCL material that had already been tested and met the requirements. Bristol required interface-shear testing on the BENTOLINER NW GCL provided by Solmax to ensure that it met all requirements for the site specification, specifically 02078 2.3 C 8: “Interfaces shall have at a minimum a friction angle of 11.5 degrees and a cohesion of 250 psf, or equivalent combination of Mohr-Coulomb strength parameters, across the range of normal loads and displacements tested.”
Solmax performed all testing and provided all of the data to show that its BENTOLINER NW material exceeded all requirements for the specifications. All testing results were delivered on time and without any impact on the project’s schedule.
Two significant challenges facing Solmax were the logistics and long lead times of getting materials to Alaska, while also keeping the project on track during those months when Alaska has the most rain. APP took advantage of every good weather day by working longer hours, and deploying as much GCL and liner as possible, in order to complete the job on schedule and within budget. Solmax’s logistics department worked closely with AAP and AAP’s freight subcontractor to schedule and ensure on-time delivery of all materials.


Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.
Comprehensive containment and capping at Thailand’s ESBEC landfill
Solmax supplied GSE® HD liners and BENTOLINER® GCLs to line and cap Thailand’s ESBEC landfill, ensuring full containment, leachate and gas control, and compliance with national and international waste standards.
Providing a stabilized platform for site development in soft soil and flood-prone areas: an alternative to traditional stabilization methods
MIRAFI® RS580i stabilized parking areas at Knapheide’s Moncks Corner facility over soft, floodplain-adjacent soils, enabling rapid construction, eliminating chemical treatment, reducing material haulage, and delivering durable performance under heavy vehicle loading.